Featured
Ashwin Prabhakar, Robin Sinha and Zubin Sinha Launch Indie Studioz, Redefining the Independent Music Landscape-TBT
Ashwin Prabhakar, Robin Sinha and Zubin Sinha Launch Indie Studioz, Redefining the Independent Music Landscape
Gujarat floods 2026, the blunt times
Gujarat Floods: 8 Dead, 50,000 Rescued as Red Alert Continues Across State
Surat-Netherlands flood management collaboration, the blunt times
Time to Revive Surat–Netherlands Heritage Ties for a Long-Term Flood Management Solution: Dr. Pankaj Gandhi
July 25, 2026
The Blunt Times The Blunt Times
  • National
  • City Events
  • Business Vibes
  • Education
  • Entertainment
  • Regional
    • Bharuch
    • Dang
    • Navsari
    • Surat
    • Valsad
    • Hindi
    • Gujarati
  • Health
  • Crime corner
  • Sports
  • Spotlight
Search the Site
Popular Searches:
Chatgpt Nasa Halloween
Recent Posts
National Award-Winning Gujarati Film Maaran Unveils Its Official Trailer Ahead of July 31 Release
July 25, 2026
Ahmedabad flood crisis, the blunt times
Ahmedabad Residents Demand Accountability as Water Stagnates for Two Days
July 25, 2026
World Head and Neck Cancer Day 2026:-PNn
World Head and Neck Cancer Day 2026: How ICG, Nerve Monitoring and Scarless Surgery Are Transforming Thyroid and Parathyroid Treatment
July 25, 2026
The Blunt Times The Blunt Times
  • National
  • City Events
  • Business Vibes
  • Education
  • Entertainment
  • Regional
    • Bharuch
    • Dang
    • Navsari
    • Surat
    • Valsad
    • Hindi
    • Gujarati
  • Health
  • Crime corner
  • Sports
  • Spotlight
Follow us
Solar
Home/Business Vibes/H&H Aluminium Pvt Ltd Unveils Nation’s Largest Solar Panel Frame Facility in Rajkot, Gujarat
Business Vibes

H&H Aluminium Pvt Ltd Unveils Nation’s Largest Solar Panel Frame Facility in Rajkot, Gujarat

Gujarat-based H&H Aluminium Pvt Ltd has launched India’s largest and most advanced aluminium solar frame manufacturing plant at Rajkot, Gujarat (India). 

TBT Online Desk
July 9, 2025 3 Min Read

Ahmedabad (Gujarat) [India], July 9: Gujarat-headquartered H&H Aluminium Pvt Ltd has officially launched India’s largest and most technologically advanced aluminium solar frame manufacturing facility in Rajkot. Located in the village of Chibhda, the plant boasts an impressive annual production capacity of 24,000 metric tons (MT), capable of supporting up to 6 Gigawatts (GW) of solar installations across the country.

The inauguration took place on July 4, 2025, and was graced by the Hon’ble Union Minister of Jal Shakti, Shri C. R. Patil, alongside senior government officials, H&H Aluminium’s leadership, and distinguished guests.

Spread across 28,000 sq. metres, this cutting-edge facility represents an investment of approximately ₹150 crore. Trial production began in June 2025, with full-scale commercial operations set to commence within the coming month. Once operating at peak capacity, the plant is projected to generate annual revenues of ₹700–750 crore and provide employment to over 300 individuals.

This initiative marks a major milestone in India’s solar infrastructure landscape, aligning with the country’s push for sustainable and self-reliant energy solutions.

Solar

Sharing more information, Mr. Uttam Patel, Director, H&H Aluminium Pvt Ltd said, “This will be India’s largest and most advanced Solar Panel aluminium frame plant at a single location, and we were able to install it in a record time of just about a year.  We are thankful to the state government and all concerned departments for their support. Currently, India imports 90–95% of aluminium solar panel frames. With this plant, we are making a meaningful step towards supporting the Make in India initiative and promoting domestic manufacturing in the solar energy sector. We expect to start commercial production within the next month.”

Highlights:

  • The company has invested around Rs. 150 crore with a manufacturing capacity of 24,000 MT per annum
  • At full capacity, the plant will be able to generate sales of Rs. 700-750 crore per annum.
  • Currently, 90-95% of the Aluminium solar panel frames are imported in India
  • In Sep 2024, Government of India imposed an anti-dumping duty ranging from $403 to $577 per MT (Equivalent to 14%) for five years on imports of Aluminium Frames for Solar Panel from China

India has set an ambitious target to install 500 GW of renewable energy capacity by 2030, with a significant portion, approximately 280 GW expected to come from solar power. 

On 29th September 2024, the Government of India, in order to safeguard the domestic industry, imposed an anti-dumping duty for a period of five years on imports of “Anodised Aluminium Frames for Solar Panels/Modules” originating in or exported from China PR. Consequently, an anti-dumping duty ranging from $403 to $577 per MT (Equivalent to 14%) is imposed on imports from specified Chinese producers/exporters and any other non-specified entities. The duty is applicable for five years from the notification date.

Mr. Vijay Kaneria, Director, H&H Aluminium Pvt Ltd, said, “India has achieved a historic milestone of 100 GW solar power capacity in 2025. In addition, the government has set an ambitious target to install 500 GW of renewable energy capacity by 2030, with a significant portion, approximately 280 GW, expected to come from solar power.  This represents a huge opportunity for solar power and allied industries over the next 5-10 years.”

Founded with the vision of driving the renewable energy sector forward, H&H Aluminium Pvt Ltd offers premium quality aluminium solar frames that meet ASTM and IEC – international standards for strength, weather resistance, and longevity to enable efficient and sustainable energy solutions.  Additionally, Rajkot plant is equipped with SCADA & IoT-enabled production lines for real-time monitoring & quality control, a fully equipped quality lab & in-house R&D for product customisation, and a zero-liquid discharge anodising setup. Company’s aluminium frames are RoHS and REACH compliant, free from hazardous substances, and 100% recyclable, aligning with eco-friendly energy initiatives.

H&H Aluminium Pvt Ltd Plant Video:- https://youtu.be/BkMe-HnjVUw

Tags:

aluminiumGujarath&h aluminiumMake In Indiamanufacturingplant inaugurationRajkotrenewable energysolar framesolar power

Share Article

Surat Diamond Factory Fire, the blunt times
Previous Post

Surat Diamond Factory Fire: Heated Diamonds, Hot Ovens, and a Cool Rescue

KLM
Next Post

KLM Axiva Finvest Rolls Out 12th Public Issue of Secured NCDs Valued at ₹150 Crore

Picked
Dharmendra Pradhan resignation, the blunt times
Dharmendra Pradhan Resigns After NEET Protest; Opposition Calls It NDA’s First Major Climbdown
Ashwin Prabhakar, Robin Sinha and Zubin Sinha Launch Indie Studioz, Redefining the Independent Music Landscape-TBT
Ashwin Prabhakar, Robin Sinha and Zubin Sinha Launch Indie Studioz, Redefining the Independent Music Landscape
Gujarat floods 2026, the blunt times
Gujarat Floods: 8 Dead, 50,000 Rescued as Red Alert Continues Across State
Surat-Netherlands flood management collaboration, the blunt times
Time to Revive Surat–Netherlands Heritage Ties for a Long-Term Flood Management Solution: Dr. Pankaj Gandhi
Indian Startup Karooli AI Takes Aim at Global AI Leaders OpenAI and Anthropic-TBT
Indian Startup Karooli AI Takes Aim at Global AI Leaders OpenAI and Anthropic
Portfolio Magazine’s Most Innovative HR Leaders in India 2026 - List of Honourees-TBT
Portfolio Magazine’s Most Innovative HR Leaders in India 2026 – List of Honourees
Popular Posts
Indian Startup Karooli AI Takes Aim at Global AI Leaders OpenAI and Anthropic-TBT
Indian Startup Karooli AI Takes Aim at Global AI Leaders OpenAI and Anthropic
By TBT Online Desk
Portfolio Magazine’s Most Innovative HR Leaders in India 2026 - List of Honourees-TBT
Portfolio Magazine’s Most Innovative HR Leaders in India 2026 – List of Honourees
By TBT Online Desk
Prof. (Dr.) Dilip Kumar Patnaik, Vice Chancellor, Medicaps University, Indore
Choosing the Right University in the Final Admission Window: What Students & Parents Should Evaluate Beyond Fees
By TBT Online Desk
Subhash Ghai & Irshad Kamil pay tribute to the timeless legacy of the legendary lyricist Anand Bakshi
Celebrating the Language of the Heart: Poetry Day at Whistling Woods International
By TBT Online Desk
Morari Bapu
Morari Bapu Begins His 981st Ram Katha in Kenya’s Tea Country
By TBT Online Desk
A Life Shaped by Questions: The Spiritual Journey of Acharya Nilay
By TBT NEWS SERVICE

Read Next

Gujarat floods 2026, the blunt times
City Events
Gujarat Floods: 8 Dead, 50,000 Rescued as Red Alert Continues Across State
July 25, 2026
2 Min Read
Rayzon
Business
Rayzon Solar and Caelux Advance India’s Solar Manufacturing with 5 GW Alliance
July 23, 2026
3 Min Read
Levi’s MANTRA partnership, the blunt time
National
Levi’s Eyes Surat’s MANTRA to Build Next-Gen Non-Denim Collection
July 22, 2026
2 Min Read
Viral Desai
National
Spirituality Meets Sustainability: Viral Desai Leads Mega Tree Plantation At Gangadhara On Ashadhi Beej
July 21, 2026
2 Min Read
The Blunt Times

The Blunt Times is a 24-hour news portal from Surat and south Gujarat. It was launched by senior journalist Melvyn Thomas, who has over 21 years of experience working with the top news organizations such as The Indian Express, The Times of India, and The Economic Times.

Popular
Dharmendra Pradhan Resigns After NEET Protest; Opposition Calls It NDA’s First Major Climbdown
July 25, 2026
Ashwin Prabhakar, Robin Sinha and Zubin Sinha Launch Indie Studioz, Redefining the Independent Music Landscape
July 25, 2026
Gujarat Floods: 8 Dead, 50,000 Rescued as Red Alert Continues Across State
July 25, 2026
Time to Revive Surat–Netherlands Heritage Ties for a Long-Term Flood Management Solution: Dr. Pankaj Gandhi
July 25, 2026
Categories
City Events
National
Business Vibes
Lifestyle
Spotlight
Education
Business
Regional
Entertainment
Health
Press Release
Sports

© 2026 All Rights Reserved, The Blunt Times

  • Terms of Service
  • Privacy Policy