Featured
Second edition of ‘Homeopathy for Anemia’ released in New Delhi-TBT
Second edition of ‘Homeopathy for Anemia’ released in New Delhi
Who Is Responsible When an AI Agent Goes Rogue?
India’s Private Space Sector Enters the FFSC Race With Astrobase’s 800 kN Everest Engine
August 10, 2026
The Blunt Times The Blunt Times
  • National
  • City Events
  • Business Vibes
  • Education
  • Entertainment
  • Regional
    • Bharuch
    • Dang
    • Navsari
    • Surat
    • Valsad
    • Hindi
    • Gujarati
  • Health
  • Crime corner
  • Sports
  • Spotlight
Search the Site
Popular Searches:
Chatgpt Nasa Halloween
Recent Posts
CARJAX AUTO CARE: How a ₹7,000 Investment Built a Growing Auto Care Business in India
August 10, 2026
SFO Tech Powers Kochi’s Entry into High-End AI Hardware-TBT
SFO Tech Powers Kochi’s Entry into High-End AI Hardware
August 10, 2026
Delta Air Lines
Delta Air Lines Breaks a Decade-Long Airbus Streak, Orders 30 Boeing 787-10 Dreamliners
August 10, 2026
The Blunt Times The Blunt Times
  • National
  • City Events
  • Business Vibes
  • Education
  • Entertainment
  • Regional
    • Bharuch
    • Dang
    • Navsari
    • Surat
    • Valsad
    • Hindi
    • Gujarati
  • Health
  • Crime corner
  • Sports
  • Spotlight
Follow us
Dahej Ro-Ro Ferry Project Failure, the blunt times
Home/City Events/Gujarat : Dahej Ferry Project Turns Into Costly Lesson as ₹407 Crore Investment Sinks in Silt
City Events

Gujarat : Dahej Ferry Project Turns Into Costly Lesson as ₹407 Crore Investment Sinks in Silt

Dahej | Gujarat — A ferry terminal built at a cost of nearly ₹290 crore and backed by another ₹117 crore in dredging expenditure has become a stark example of how ignoring environmental realities can...

Times News Network
June 8, 2026 2 Min Read

Dahej | Gujarat — A ferry terminal built at a cost of nearly ₹290 crore and backed by another ₹117 crore in dredging expenditure has become a stark example of how ignoring environmental realities can turn ambitious infrastructure projects into costly liabilities. The Dahej-Ghogha Ro-Ro ferry project, once promoted as a transformative maritime link between South Gujarat and Saurashtra, now stands largely non-functional, raising serious questions about planning, accountability and the use of public funds.

The Dahej terminal, constructed by the Gujarat Maritime Board (GMB), was envisioned as a key component of a larger ₹615-crore ferry connectivity project. However, experts and feasibility studies had reportedly flagged concerns as early as 2001 about the location’s suitability. Situated at the mouth of the Narmada River and adjacent to the Gulf of Khambhat, Dahej is naturally prone to heavy siltation, rapid sediment accumulation and strong tidal currents.

According to findings from studies conducted during the project’s planning stage, maintaining the minimum five-metre draft required for Ro-Ro ferry operations at Dahej would be a persistent challenge. Despite these warnings, the terminal was built and repeated dredging operations were undertaken to keep the navigation channel operational.

Over the years, crores of rupees were spent removing accumulated mud and sediment. Yet the problem repeatedly resurfaced. Contractors and operators reportedly communicated their concerns to both state and central authorities, warning that ferry operations could not be sustained without continuous and expensive dredging.

The concerns eventually proved valid. Ferry services on the Ghogha-Dahej route faced multiple interruptions before large vehicle operations were permanently halted in March 2020. An attempt to revive the route in 2021 using a smaller passenger vessel also failed due to poor ridership and high maintenance costs.

Ironically, a consultancy report prepared by London-based Beckett Rankin in association with infrastructure experts had reportedly projected significantly higher revenue potential on the Ghogha-Surat route than on the Ghogha-Dahej corridor. The study estimated weekly earnings of ₹6.67 lakh on the Ghogha-Surat route compared to only ₹1.28 lakh on the Ghogha-Dahej route.

Following the collapse of the Dahej operation, authorities shifted focus to the Ghogha-Hazira Ro-Pax service, which has remained operational due to more favourable marine conditions and year-round navigability. The Hazira route has since emerged as the primary maritime link connecting Saurashtra with South Gujarat.

Meanwhile, the future of the Dahej terminal remains uncertain. After ferry services ceased, the facility was handed over to the port authorities, but reports indicate it was returned within months. The Deendayal Port Authority is now reportedly pursuing legal and administrative procedures to transfer the infrastructure back to the Gujarat Maritime Board for alternative use.

Tags:

Dahej Ro-Ro FerryDahej TerminalFerry Service GujaratGhogha-Dahej FerryGujaratGujarat infrastructureGujarat Maritime BoardThe blunt times

Share Article

Hamstech Unveils ‘Hamstech Launchpad’ to Empower Young Entrepreneurs-TBT
Previous Post

Hamstech Unveils ‘Hamstech Launchpad’ to Empower Young Entrepreneurs

Gujarat ITI New-Age Courses, the blunt times
Next Post

Gujarat ITIs Embrace Future Skills with AI, Drone and EV Courses

Picked
Villow Launches Buyer-First Platform to Make Property Buying in Gurugram More Transparent
Second edition of ‘Homeopathy for Anemia’ released in New Delhi-TBT
Second edition of ‘Homeopathy for Anemia’ released in New Delhi
Who Is Responsible When an AI Agent Goes Rogue?
India’s Private Space Sector Enters the FFSC Race With Astrobase’s 800 kN Everest Engine
Are Ray-Ban Meta Smart Glasses a Privacy Risk? What Users Need to Know
Paul Merchants
Paul Merchants Gets RBI Approval for Perpetual AD Category-II Licence Under Revised FEMA Framework
Popular Posts
Are Ray-Ban Meta Smart Glasses a Privacy Risk? What Users Need to Know
By Santhosh Kumar
Paul Merchants
Paul Merchants Gets RBI Approval for Perpetual AD Category-II Licence Under Revised FEMA Framework
By TBT Online Desk
Snyvia Launches Raksha Bandhan 2026 Buy One Get One Free Offer on Women's Ethnic Wear-TBT
Snyvia Launches Raksha Bandhan 2026 Buy One Get One Free Offer on Women’s Ethnic Wear
By TBT Online Desk
India’s Tractor
India’s Tractor Retail Sales Surge 27.82% in July 2026, Cross 1.07 Lakh Units
By TBT Online Desk
Domicil
Domicil Returns as Lounge Partner for the Indian Streaming Academy Awards 2026
By TBT Online Desk
FramesNFlights
India’s AI Travel Couple, FramesNFlights by Glido Labs, Crosses 100K Followers, Showing That Great Content Beats the AI vs Human Debate
By TBT Online Desk

Read Next

Ajay’s Cafe
Business
Friendship Day Drives Record Consumption at Ajay’s Cafe with 89% Jump in Cold Coffee Sales
August 5, 2026
2 Min Read
Sarigam pollution PIL, the blunt times
City Events
Gujarat HC to Hear Sarigam Pollution PIL on August 11
August 5, 2026
2 Min Read
Gujarat tribal organ transplant scheme, the blunt times
City Events
Gujarat Launches Rs.2 Crore Health Scheme for Tribal Organ Transplants, Robotic Surgeries
August 4, 2026
2 Min Read
HDFC Bank Max for Seniors and Max for Her, the blunt times
Business
HDFC Bank Launches New Savings Accounts for Seniors, Women
August 4, 2026
2 Min Read
The Blunt Times

The Blunt Times is a 24-hour news portal from Surat and south Gujarat. It was launched by senior journalist Melvyn Thomas, who has over 21 years of experience working with the top news organizations such as The Indian Express, The Times of India, and The Economic Times.

Popular
Villow Launches Buyer-First Platform to Make Property Buying in Gurugram More Transparent
August 8, 2026
Second edition of ‘Homeopathy for Anemia’ released in New Delhi
August 8, 2026
Who Is Responsible When an AI Agent Goes Rogue?
August 8, 2026
India’s Private Space Sector Enters the FFSC Race With Astrobase’s 800 kN Everest Engine
August 8, 2026
Categories
City Events
National
Business Vibes
Lifestyle
Business
Spotlight
Education
Regional
Entertainment
Health
Press Release
Sports

© 2026 All Rights Reserved, The Blunt Times

  • Terms of Service
  • Privacy Policy