Featured
Surat Metro project progress, the blunt times
Surat Metro Speeds Ahead as Second Corridor Trials Begin
Surat car pooling and electric buses initiative, the blunt times
Surat Pushes Green Governance: Car Pooling Rule and 600 Electric Buses Announced
Gujarat mayor appointment delay, the blunt times
After Landslide Victory, BJP Struggles to Finalise Mayors Across Gujarat
May 14, 2026
The Blunt Times The Blunt Times
  • National
  • City Events
  • Business Vibes
  • Education
  • Entertainment
  • Regional
    • Bharuch
    • Dang
    • Navsari
    • Surat
    • Valsad
    • Hindi
    • Gujarati
  • Health
  • Crime corner
  • Sports
  • Spotlight
Search the Site
Popular Searches:
Chatgpt Nasa Halloween
Recent Posts
World Human Rights Protection Commission (WHRPC) – Serving the Nation Since 2013 Through Human Rights Awareness and Social Service-PNN
World Human Rights Protection Commission (WHRPC) – Serving the Nation Since 2013 Through Human Rights Awareness and Social Service
May 14, 2026
Paras Health
Paras Health Launches ‘Umeed Ke Sitare’ to Celebrate Cancer Survivors Ahead of May 16 Showcase
May 14, 2026
Team Shabnam
Team Shabnam: Two Decades of Thoughtful Design
May 14, 2026
The Blunt Times The Blunt Times
  • National
  • City Events
  • Business Vibes
  • Education
  • Entertainment
  • Regional
    • Bharuch
    • Dang
    • Navsari
    • Surat
    • Valsad
    • Hindi
    • Gujarati
  • Health
  • Crime corner
  • Sports
  • Spotlight
Follow us
KP Energy obtains NTPC REL NoA for 464.10 MW BoS package for Gujarat wind project
Home/Press Release/KP Energy obtains NTPC REL NoA for 464.10 MW BoS package for Gujarat wind project
Press Release

KP Energy obtains NTPC REL NoA for 464.10 MW BoS package for Gujarat wind project

Surat : KP Energy Limited, a frontrunner in the renewable energy industry, has reached a major milestone with the announcement that it has been awarded a 464.10 MW Balance of System Package by NTPC...

Times News Network
October 3, 2023 2 Min Read

Surat : KP Energy Limited, a frontrunner in the renewable energy industry, has reached a major milestone with the announcement that it has been awarded a 464.10 MW Balance of System Package by NTPC Renewable Energy Limited (NTPC REL). This equipment was manufactured for the Gujarat Wind Energy Project, which is connected to the ISTS.

KP Energy won the contract from NTPC REL, a division of NTPC, after a lengthy and intense bidding procedure, demonstrating once again its superiority in the field of renewable energy. The project is appropriate for the firm’s Captive Power Producer (CPP) division.

KP Energy will provide full Engineering, Procurement, Construction, and Commissioning (EPCC) services per the terms of the contracts. Included in these services are land acquisition and transfer, equipment supply for the balance of plant, and a host of others such as offloading, storage, on-site handling, installation, insurance, civil and allied works, grid integration, testing, and commissioning. For the next three years, the firm will also be in charge of running and maintaining the contracted-for infrastructure to guarantee its peak efficiency and dependability.

Dr. Faruk G Patel, Chairman and Managing Director of KP Group, said, “We are thrilled to receive the Notification of Award for this vital project from NTPC REL. It underscores our strong presence in the renewable energy sector and our expertise in the timely execution of challenging projects. The project aligns with our mission to contribute to sustainable energy solutions and reflects the trust clients have in our project execution capabilities. KP Group remains committed to delivering high-quality renewable energy projects that contribute to India’s green energy goals and promote a cleaner and greener future.”

As per the contract, the project is slated to be completed within 21 months from the date of the NOA.

Earlier, KP Energy successfully commissioned a 29.4MW (Phase-II) ISTS-connected wind power project comprising 14 WTGs of 2.1 MW each at Sidhpur site in Devbhumi Dwarka.

Tags:

KP EnergyKP Energy obtains NTPC REL NoANTPC RELSurat

Share Article

Romal Ramgarihia Explains Modern Indian Media Funding
Previous Post

Romil Ramgarihia Explains Modern Indian Media Funding

CIBJO Congress 2023 in Jaipur to elevate India's role in global gem and jewellery sourcing
Next Post

CIBJO Congress 2023 in Jaipur to elevate India’s role in global gem and jewellery sourcing

Picked
Kimberley Process delegates Bharat Diamond Bourse, the blunt times
Kimberley Process Delegates Honoured at Bharat Diamond Bourse
Surat Metro project progress, the blunt times
Surat Metro Speeds Ahead as Second Corridor Trials Begin
Surat car pooling and electric buses initiative, the blunt times
Surat Pushes Green Governance: Car Pooling Rule and 600 Electric Buses Announced
Gujarat mayor appointment delay, the blunt times
After Landslide Victory, BJP Struggles to Finalise Mayors Across Gujarat
tribal biogas initiative Statue of Unity, the blunt times
1,000 Tribal Homes Near Statue of Unity Get Biogas Boost
Chotila Rajkot highway bus accident, the blunt times
4 Burnt Alive, 10 Injured in Fiery Midnight Bus–Tanker Crash Near Chotila
Popular Posts
tribal biogas initiative Statue of Unity, the blunt times
1,000 Tribal Homes Near Statue of Unity Get Biogas Boost
By Times News Network
Chotila Rajkot highway bus accident, the blunt times
4 Burnt Alive, 10 Injured in Fiery Midnight Bus–Tanker Crash Near Chotila
By Times News Network
Tanishq Celebrates Mother’s Day with an Exclusive Luxury Experience at Palladium Ahmedabad-PNn
Tanishq Celebrates Mother’s Day with an Exclusive Luxury Experience at Palladium Ahmedabad
By TBT Online Desk
India Takes Centre Stage at the 79th Festival de Cannes-TBT
India Takes Centre Stage at the 79th Festival de Cannes
By TBT Online Desk
Sparx launches the unique Shoe-Style Sandals Under ‘Summer Swag’ Campaign-TBT
Sparx launches the unique Shoe-Style Sandals Under ‘Summer Swag’ Campaign
By TBT Online Desk
Imperial College London announces STEMathon 3.0, calling India’s most ambitious students to solve real world challenges-TBT
Imperial College London announces STEMathon 3.0, calling India’s most ambitious students to solve real world challenges
By TBT Online Desk

Read Next

Surat Metro project progress, the blunt times
City Events
Surat Metro Speeds Ahead as Second Corridor Trials Begin
May 14, 2026
2 Min Read
Surat car pooling and electric buses initiative, the blunt times
City Events
Surat Pushes Green Governance: Car Pooling Rule and 600 Electric Buses Announced
May 14, 2026
2 Min Read
Surat New Civil Hospital transfer demand officers, the blunt times
City Events
Gujarat : Demand for Transparent Transfers at Surat Civil Hospital Triggers Administrative Debate
May 13, 2026
2 Min Read
Surat dropout re-admission drive, the blunt times
City Events
Surat Commissioner Reaches Homes to Bring Dropout Children Back to School
May 12, 2026
2 Min Read
The Blunt Times

The Blunt Times is a 24-hour news portal from Surat and south Gujarat. It was launched by senior journalist Melvyn Thomas, who has over 21 years of experience working with the top news organizations such as The Indian Express, The Times of India, and The Economic Times.

Popular
Kimberley Process Delegates Honoured at Bharat Diamond Bourse
May 14, 2026
Surat Metro Speeds Ahead as Second Corridor Trials Begin
May 14, 2026
Surat Pushes Green Governance: Car Pooling Rule and 600 Electric Buses Announced
May 14, 2026
After Landslide Victory, BJP Struggles to Finalise Mayors Across Gujarat
May 14, 2026
Categories
City Events
National
Business Vibes
Lifestyle
Spotlight
Regional
Education
Entertainment
Health
Press Release
Trending
Sports

© 2026 All Rights Reserved, The Blunt Times

  • Terms of Service
  • Privacy Policy