H&H Aluminium Pvt Ltd Unveils Nation’s Largest Solar Panel Frame Facility in Rajkot, Gujarat
Shri C. R. Patil, Hon’ble Union Minister of Jal Shakti, Government of India inaugurated the plant on July 4, 2025
Gujarat-based H&H Aluminium Pvt Ltd has launched India’s largest and most advanced aluminium solar frame manufacturing plant at Rajkot, Gujarat (India).

Advertisement
Ahmedabad (Gujarat) [India], July 9: Gujarat-headquartered H&H Aluminium Pvt Ltd has officially launched India’s largest and most technologically advanced aluminium solar frame manufacturing facility in Rajkot. Located in the village of Chibhda, the plant boasts an impressive annual production capacity of 24,000 metric tons (MT), capable of supporting up to 6 Gigawatts (GW) of solar installations across the country.
The inauguration took place on July 4, 2025, and was graced by the Hon’ble Union Minister of Jal Shakti, Shri C. R. Patil, alongside senior government officials, H&H Aluminium’s leadership, and distinguished guests.
Spread across 28,000 sq. metres, this cutting-edge facility represents an investment of approximately ₹150 crore. Trial production began in June 2025, with full-scale commercial operations set to commence within the coming month. Once operating at peak capacity, the plant is projected to generate annual revenues of ₹700–750 crore and provide employment to over 300 individuals.
This initiative marks a major milestone in India’s solar infrastructure landscape, aligning with the country’s push for sustainable and self-reliant energy solutions.

Sharing more information, Mr. Uttam Patel, Director, H&H Aluminium Pvt Ltd said, “This will be India’s largest and most advanced Solar Panel aluminium frame plant at a single location, and we were able to install it in a record time of just about a year. We are thankful to the state government and all concerned departments for their support. Currently, India imports 90–95% of aluminium solar panel frames. With this plant, we are making a meaningful step towards supporting the Make in India initiative and promoting domestic manufacturing in the solar energy sector. We expect to start commercial production within the next month.”
Highlights:
- The company has invested around Rs. 150 crore with a manufacturing capacity of 24,000 MT per annum
- At full capacity, the plant will be able to generate sales of Rs. 700-750 crore per annum.
- Currently, 90-95% of the Aluminium solar panel frames are imported in India
- In Sep 2024, Government of India imposed an anti-dumping duty ranging from $403 to $577 per MT (Equivalent to 14%) for five years on imports of Aluminium Frames for Solar Panel from China
India has set an ambitious target to install 500 GW of renewable energy capacity by 2030, with a significant portion, approximately 280 GW expected to come from solar power.
On 29th September 2024, the Government of India, in order to safeguard the domestic industry, imposed an anti-dumping duty for a period of five years on imports of “Anodised Aluminium Frames for Solar Panels/Modules” originating in or exported from China PR. Consequently, an anti-dumping duty ranging from $403 to $577 per MT (Equivalent to 14%) is imposed on imports from specified Chinese producers/exporters and any other non-specified entities. The duty is applicable for five years from the notification date.
Mr. Vijay Kaneria, Director, H&H Aluminium Pvt Ltd, said, “India has achieved a historic milestone of 100 GW solar power capacity in 2025. In addition, the government has set an ambitious target to install 500 GW of renewable energy capacity by 2030, with a significant portion, approximately 280 GW, expected to come from solar power. This represents a huge opportunity for solar power and allied industries over the next 5-10 years.”
Founded with the vision of driving the renewable energy sector forward, H&H Aluminium Pvt Ltd offers premium quality aluminium solar frames that meet ASTM and IEC – international standards for strength, weather resistance, and longevity to enable efficient and sustainable energy solutions. Additionally, Rajkot plant is equipped with SCADA & IoT-enabled production lines for real-time monitoring & quality control, a fully equipped quality lab & in-house R&D for product customisation, and a zero-liquid discharge anodising setup. Company’s aluminium frames are RoHS and REACH compliant, free from hazardous substances, and 100% recyclable, aligning with eco-friendly energy initiatives.
H&H Aluminium Pvt Ltd Plant Video:- https://youtu.be/BkMe-HnjVUw
Advertisement
