Featured
600 Entries, 50 Shortlisted Photographs: Wildlife Photography Exhibition Set for Mumbai
600 Entries, 50 Shortlisted Photographs: Wildlife Photography Exhibition Set for Mumbai
GLOBOIL India
From Oil Prices to Biofuels: GLOBOIL India 2026 to Bring Global Commodity Leaders to Mumbai
Business
India’s New Business Transition Economy: What Happens After a Business Is Built?
September 16, 2026
The Blunt Times The Blunt Times
  • National
  • City Events
  • Business Vibes
  • Education
  • Entertainment
  • Regional
    • Bharuch
    • Dang
    • Navsari
    • Surat
    • Valsad
    • Hindi
    • Gujarati
  • Health
  • Crime corner
  • Sports
  • Spotlight
Search the Site
Popular Searches:
Chatgpt Nasa Halloween
Recent Posts
Kyptec Automation® Expands M12 X Coded Industrial Ethernet Cable Portfolio for Rugged Machine Vision Camera Connectivity
Kyptec Automation® Expands M12 X Coded Industrial Ethernet Cable Portfolio for Rugged Machine Vision Camera Connectivity
September 16, 2026
Maiden
Maiden Forgings Streamlines Operation; Adds Galvanised Wire to Target Margin Growth
September 16, 2026
KIRA Lab-Grown Diamond Jobs in Surat, the blunt times
KIRA Lab-Grown Diamonds Bags IGJA Award for Creating 10,500 Jobs in Surat
September 16, 2026
The Blunt Times The Blunt Times
  • National
  • City Events
  • Business Vibes
  • Education
  • Entertainment
  • Regional
    • Bharuch
    • Dang
    • Navsari
    • Surat
    • Valsad
    • Hindi
    • Gujarati
  • Health
  • Crime corner
  • Sports
  • Spotlight
Follow us
India’s Bullet Train Corridor Hits 300 km Viaduct Milestone, the blunt times
Home/City Events/India’s Bullet Train Corridor Hits 300 km Viaduct Milestone
City EventsNational

India’s Bullet Train Corridor Hits 300 km Viaduct Milestone

Surat, Gujarat –  India’s first Bullet Train corridor between Mumbai and Ahmedabad has reached a significant construction milestone with the successful completion of 300 km of viaducts. This...

Times News Network
May 20, 2025 2 Min Read

Surat, Gujarat –  India’s first Bullet Train corridor between Mumbai and Ahmedabad has reached a significant construction milestone with the successful completion of 300 km of viaducts. This achievement was marked by the launching of a 40 m long full-span box girder near the diamond city of Surat, Gujarat.

Out of 300 km of superstructure, 257.4 km is constructed through Full Span Launching Method (FSLM) including 14 river bridges, 37.8 km through Span by Span (SBS), 0.9 km steel bridges (10 spans ranging from 60 to 130 m in 7 bridges), 1.2 km PSC bridges (20 spans ranging from 40 to 80 m in 5 bridges) and 2.7 km in station building.

For constructing 257.4 km of viaduct through FSLM and 37.8 km of viaduct through SBS, 6455 & 925 spans of 40 m each respectively were used.

The project has supported the use of indigenously designed and manufactured equipment such as Straddle Carriers, Launching Gantries, Bridge Gantries, and Girder Transporters for construction. This marks a first for Indian infrastructure, showcasing India’s growing capabilities in high-speed rail technology with the support from Japanese government.

The adoption of Full Span Launching Method has significantly accelerated construction, as full-span girder erection is up to ten (10) times faster than conventional segmental methods. Each full span box girder weighs 970 metric tons. Segmental girders are used selectively in locations where full-span installation is not feasible.

To facilitate construction, 27 dedicated casting yards were established along the corridor. Steel bridges are fabricated in seven workshops spread all across the country, three in Gujarat, one each in Uttar Pradesh, Tamil Nadu, Maharashtra and West Bengal truly exemplifying the spirit of unity of our country.

More than 3 lakh noise barriers have been installed along the viaducts to mitigate noise during operations.

In addition to the viaducts, the project has also completed, 383 km of pier work, 401 km of foundation work and 326 km of girder casting.

The thematic Bullet Train stations are rapidly taking shape. These stations will be integrated with rail and road based transport system to provide seamless travel to passengers. The stations will be equipped with state of the art passenger amenities.

Track works over viaducts have also started and around 157 track km of RC track bed construction has been achieved so far in Gujarat.

The rolling stock depots with modern infrastructure are also are getting ready in Maharashtra and Gujarat.

This milestone is a demonstration to the project’s robust planning, cutting-edge engineering, and commitment to “Make in India” policy.

Tags:

Bullet Train IndiaFull Span Launching MethodHigh-Speed Rail IndiaIndian InfrastructureIndian Rail TechnologyJapanese Government SupportMake In IndiaMumbai-Ahmedabad Bullet TrainNoise Barriers Bullet TrainSuratSurat DiamondViaduct Construction

Share Article

Mumbai COVID cases May 2025, the blunt times
Previous Post

Mumbai Reports 53 New COVID Cases Amid Asia Wave

Dahod MGNREGA Scandal, the blunt times
Next Post

Gujarat Minister Defends his Sons in MGNREGA Scam

Picked
Kejriwal PM Degree Case, the blunt times
PM Degree Row: Solicitor General Slams Kejriwal’s Plea in Gujarat HC
600 Entries, 50 Shortlisted Photographs: Wildlife Photography Exhibition Set for Mumbai
600 Entries, 50 Shortlisted Photographs: Wildlife Photography Exhibition Set for Mumbai
GLOBOIL India
From Oil Prices to Biofuels: GLOBOIL India 2026 to Bring Global Commodity Leaders to Mumbai
Business
India’s New Business Transition Economy: What Happens After a Business Is Built?
IIT Gandhinagar ITEC Programme, the blunt times
IIT Gandhinagar hosts faculty from 20 countries for ITEC programme
Gold Hallmarking Fee Hike, the blunt times
Gold Hallmarking Fee Hiked 67%, Jewellers Protest
Popular Posts
IIT Gandhinagar ITEC Programme, the blunt times
IIT Gandhinagar hosts faculty from 20 countries for ITEC programme
By Times News Network
Gold Hallmarking Fee Hike, the blunt times
Gold Hallmarking Fee Hiked 67%, Jewellers Protest
By Times News Network
Gujarat Congress leader son fake passport case, the blunt times
Gujarat Senior Congress leader’s son arrested by ATS in Fake Passport case
By Times News Network
Gujarat Child Protection Policy 2026, the blunt times
Gujarat Unveils Child Protection Policy 2026
By Times News Network
Gujarat Government Emblem Misuse, the blunt times
Gujarat Cracks Down on Misuse of Government Names
By Times News Network
GEL PNG Service Complaints in Surat, the blunt times
GEL Faces Heat Over PNG Service Woes in South Gujarat
By Times News Network

Read Next

KIRA Lab-Grown Diamond Jobs in Surat, the blunt times
National
KIRA Lab-Grown Diamonds Bags IGJA Award for Creating 10,500 Jobs in Surat
September 16, 2026
2 Min Read
Kejriwal PM Degree Case, the blunt times
National
PM Degree Row: Solicitor General Slams Kejriwal’s Plea in Gujarat HC
September 16, 2026
2 Min Read
IIT Gandhinagar ITEC Programme, the blunt times
City Events
IIT Gandhinagar hosts faculty from 20 countries for ITEC programme
September 16, 2026
2 Min Read
Gold Hallmarking Fee Hike, the blunt times
City Events
Gold Hallmarking Fee Hiked 67%, Jewellers Protest
September 16, 2026
2 Min Read
The Blunt Times

The Blunt Times is a 24-hour news portal from Surat and south Gujarat. It was launched by senior journalist Melvyn Thomas, who has over 21 years of experience working with the top news organizations such as The Indian Express, The Times of India, and The Economic Times.

Popular
PM Degree Row: Solicitor General Slams Kejriwal’s Plea in Gujarat HC
September 16, 2026
600 Entries, 50 Shortlisted Photographs: Wildlife Photography Exhibition Set for Mumbai
September 16, 2026
From Oil Prices to Biofuels: GLOBOIL India 2026 to Bring Global Commodity Leaders to Mumbai
September 16, 2026
India’s New Business Transition Economy: What Happens After a Business Is Built?
September 16, 2026
Categories
City Events
National
Business Vibes
Lifestyle
Business
Education
Spotlight
Entertainment
Regional
Health
Press Release
Sports

© 2026 All Rights Reserved, The Blunt Times

  • Terms of Service
  • Privacy Policy